|
This
facility, manufacturing gaskets, is located on flat land
on the outskirts of Pune. A
single level structure houses the raw material
incoming, testing, despatch as well as scrap collection
at the rear, while training and administrative areas are
located in the front.
|
|
In
order to deviate from a stereotype design, a courtyard
was introduced, around which the administrative
functions are arranged. |
|
This combined with the curvilinear
form breaks the formality of any industrial
facility and creates visual interest. The presence
of a garden in the centre of the built area provides
unexpected peace and serenity
to the otherwise stressed environment.
Client:
Perfect Circle
Location: Victor Limited Pune, Maharashtra
Project Type: Architectural - Industrial
Area of Project: 50,000 sq. ft.
Cost of Project: Rs. 650,00,000.00
Year of Completion: 1997
|
|
|
|
|
|
|
Large
fenestrations, cantilevers
and a raised parapet coping define the elevational
treatment. A shell of concrete folded
plate structure incorporating the north
light spans the shop floor in a 18.0
m x 18.0 m. grid.
|
|
|